"basicData": {
"阶段类型": "无",
"插件名称": "",
"地区插件": "",
"执行规范": "国网清单规范2014年版",
"软件名称": "主网",
"工程版本": "3.2.3.32",
"工程类型": "招标控制价",
"工程类别": "主网工程",
"工程文件预览信息": "●工程名称:10.22 变电站-综合单价-性能工程(清单500,消耗量1500)\n●项目划分:变电站工程\n●工程阶段:最高投标限价\n●地区类型:Ⅰ类\n●工程所在地:上海\n●执行规范:国网清单规范2014年版\n●工程版本:3.2.3.32\n●升级历史:1.0.7.4;1.1.0.61;1.2.0.111;1.3.0.65;1.3.1.84;1.4.0.72;1.4.1.61;1.4.2.14;1.5.0.6;1.5.1.112;1.5.2.7;1.6.0.73;1.6.1.67;2.0.0.98;2.0.1.6;2.1.0.61;2.1.0.175;2.2.1.2;2.3.0.83;2.3.1.5;2.3.4.3;2.4.0.124;2.4.1.4;2.5.0.155;2.5.1.14;2.6.0.218;2.6.2.0;2.7.0.0;2.8.0.0;3.0.0.0;3.0.1.0;3.1.0.0;3.1.1.0;3.1.2.0;3.2.0.0;3.2.2.0;3.2.3.0;\n●加密属性:"
},
"currentStage": "99",
"division": "主网-招标控制价-无",
"errorCode": "200",
"errorMsg": "请求成功",
"errorStatus": true,
"fileName": "变电站-综合单价-性能工程(清单:500,消耗量:1500.zwqd",
"fileType": ".ZWQD",
"finish": true,
"projectData": {
"projectInfo": {
"执行规范": "国网清单规范2014年版",
"工程阶段": "最高投标限价",
"是否是合并工程": "否",
"项目划分": "变电站工程",
"地区类型": "Ⅰ类",
"编制时间": "2020-10-22",
"工程改造性质": "扩建间隔",
"甲供材料计入综合单价": "是",
"工程性质": "扩建间隔",
"工程类型": "变电",
"工程造价咨询人": "6",
"工程版本": "3.2.3.32",
"组价方式": "综合单价",
"工程名称": "10.22 变电站-综合单价-性能工程(清单500,消耗量1500)",
"工程总投资": "14.571",
"招标人": "6",
"工程所在地": "上海",
"特殊地区": "常规地区",
"最高投标限价(万元)": "145709.974603",
"清单规范": "2014版",
"电压等级": "110kV",
"市场价唯一": "是",
"预算类型": "招标控制价",
"甲供材料计入本体": "是",
"安装材料调差系数": "1.52",
"是否按单位控制工程量精度": "否",
"建筑拆除人工调差系数": "4.95",
"安装人工调差系数": "6",
"人工按系数调差": "1",
"安装主要设备运杂费率": "0",
"调差选择地区类型": "Ⅰ类 地区",
"拆除调差系数年份": "2022年上半年调差系数文件(21号文)",
"住房公积金缴费费率": "0",
"调差选择所在地": "上海",
"软件名称": "博微电力建设计价通软件",
"材料调差系数": "1.52",
"安装其他设备运杂费率": "0",
"机械调差系数": "8",
"人工调差系数": "6",
"工程税率": "9",
"调差系数年份": "调差系数文件〔2020年14号文〕",
"安装机械调差系数": "8",
"项目类型": "变电站工程"
},
"costSetting": {
"余物清理建筑": {
"name": "余物清理建筑",
"TypeList": "余物清理建筑,金属结构余物清理建筑",
"tables": [
{
"name": "建筑取费表(余物清理)",
"OutlayID": "7_6",
"类型": "余物清理建筑",
"专业": "余物清理建筑",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "ZJGCF+CSF",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "取费定额甲供材料费含税_单价+甲供取费主材费含税_单价+取费定额乙供材料费不含税_单价+乙供取费主材费不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "措施费",
"代码": "CSF",
"费率(%)": "100",
"children": [
{
"序号": "2.1",
"费用名称": "冬雨季施工增加费",
"代码": "DYF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "0.62"
},
{
"序号": "2.2",
"费用名称": "夜间施工增加费",
"代码": "YSF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "0.1"
},
{
"序号": "2.3",
"费用名称": "施工工具用具使用费",
"代码": "SYF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "0.56"
},
{
"序号": "2.4",
"费用名称": "特殊地区施工增加费",
"代码": "TSF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "0"
},
{
"序号": "2.5",
"费用名称": "临时设施费",
"代码": "LSF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "1.7"
},
{
"序号": "2.6",
"费用名称": "施工机构迁移费",
"代码": "ZYF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "0.35"
},
{
"序号": "2.7",
"费用名称": "安全文明施工费",
"代码": "WMF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "2.93"
}
]
}
]
}
]
},
{
"name": "建筑取费表(金属结构余物清理)",
"OutlayID": "7_7",
"类型": "金属结构余物清理建筑",
"专业": "余物清理建筑",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "ZJGCF+CSF",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "取费定额甲供材料费含税_单价+取费定额乙供材料费不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "措施费",
"代码": "CSF",
"费率(%)": "100",
"children": [
{
"序号": "2.1",
"费用名称": "安全文明施工费",
"代码": "WMF",
"取费基数": "ZJGCF-甲供消材进项税额_单价",
"费率(%)": "2.93"
}
]
}
]
}
]
}
]
},
"拆除建筑": {
"name": "拆除建筑",
"TypeList": "拆除建筑",
"tables": [
{
"name": "建筑取费表(拆除)",
"OutlayID": "9_10",
"类型": "拆除建筑",
"专业": "拆除建筑",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "ZJF+JJF+LR+RCJJC+不取费定额费不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接费",
"代码": "ZJF",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"费率(%)": "100",
"children": [
{
"序号": "1.1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价",
"费率(%)": "100"
},
{
"序号": "1.1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBXC+TBXC",
"费率(%)": "100",
"children": [
{
"序号": "1.1.2.1",
"费用名称": "招标人采购消材",
"代码": "ZBXC",
"取费基数": "取费定额甲供材料费含税_单价",
"费率(%)": "100"
},
{
"序号": "1.1.2.2",
"费用名称": "投标人采购消材",
"代码": "TBXC",
"取费基数": "取费定额乙供材料费不含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.2",
"费用名称": "措施费",
"代码": "CSF",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "冬雨季施工增加费",
"代码": "DYF",
"取费基数": "RGF+JXF",
"费率(%)": "2.85"
},
{
"序号": "1.2.2",
"费用名称": "施工工具用具使用费",
"代码": "SYF",
"取费基数": "RGF+JXF",
"费率(%)": "5.51"
},
{
"序号": "1.2.3",
"费用名称": "特殊地区施工增加费",
"代码": "TSF",
"取费基数": "RGF+JXF",
"费率(%)": "0"
},
{
"序号": "1.2.4",
"费用名称": "临时设施费",
"代码": "LSF",
"取费基数": "RGF+JXF",
"费率(%)": "13.67",
"备注": "独立的拆除工程可计取此项费,与其他工程同期实施的拆除工作不计取此项费用"
},
{
"序号": "1.2.5",
"费用名称": "施工机构迁移费",
"代码": "ZYF",
"取费基数": "RGF+JXF",
"费率(%)": "1.97",
"备注": "独立的拆除工程可计取此项费,与其他工程同期实施的拆除工作不计取此项费用"
},
{
"序号": "1.2.6",
"费用名称": "安全文明施工费",
"代码": "WMF",
"取费基数": "RGF+JXF",
"费率(%)": "12.84"
}
]
}
]
},
{
"序号": "2",
"费用名称": "间接费",
"代码": "JJF",
"费率(%)": "100",
"children": [
{
"序号": "2.1",
"费用名称": "规费",
"代码": "GF",
"费率(%)": "100",
"children": [
{
"序号": "2.1.1",
"费用名称": "社会保险费",
"代码": "SBF",
"取费基数": "RGF*1.12",
"费率(%)": "0"
},
{
"序号": "2.1.2",
"费用名称": "住房公积金",
"代码": "GJJ",
"取费基数": "RGF*1.12",
"费率(%)": "0"
}
]
},
{
"序号": "2.2",
"费用名称": "企业管理费",
"代码": "GLF",
"取费基数": "RGF+JXF",
"费率(%)": "40"
}
]
},
{
"序号": "3",
"费用名称": "利润",
"代码": "LR",
"取费基数": "RGF+JXF",
"费率(%)": "8.71"
},
{
"序号": "4",
"费用名称": "编制基准期价差",
"代码": "RCJJC",
"费率(%)": "100",
"children": [
{
"序号": "4.1",
"费用名称": "人工价差",
"代码": "RGC",
"取费基数": "取费人工价差_单价",
"费率(%)": "100"
},
{
"序号": "4.2",
"费用名称": "材料价差",
"代码": "CLC",
"取费基数": "ZBCLC+TBCLC",
"费率(%)": "100",
"children": [
{
"序号": "4.2.1",
"费用名称": "招标人采购材料价差",
"代码": "ZBCLC",
"取费基数": "取费甲供材料价差含税_单价",
"费率(%)": "100"
},
{
"序号": "4.2.2",
"费用名称": "投标人采购材料价差",
"代码": "TBCLC",
"取费基数": "取费乙供材料价差不含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "4.3",
"费用名称": "机械价差",
"代码": "JXC",
"取费基数": "取费机械价差_单价",
"费率(%)": "100"
}
]
}
]
}
]
}
]
},
"余物清理安装": {
"name": "余物清理安装",
"TypeList": "余物清理安装",
"tables": [
{
"name": "安装取费表(余物清理)",
"OutlayID": "8_8",
"类型": "余物清理安装",
"专业": "余物清理安装",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "ZJGCF+CSF",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "定额直接费",
"代码": "DZF",
"费率(%)": "100",
"children": [
{
"序号": "1.1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价",
"费率(%)": "100"
},
{
"序号": "1.1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "取费定额甲供材料费含税_单价+取费定额乙供材料费不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.2",
"费用名称": "装置性材料费",
"代码": "ZCF",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "招标人采购材料",
"代码": "ZBCL",
"取费基数": "甲供取费主材费含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.2",
"费用名称": "投标人采购材料",
"代码": "TBCL",
"取费基数": "乙供取费主材费不含税_单价",
"费率(%)": "100"
}
]
}
]
},
{
"序号": "2",
"费用名称": "措施费",
"代码": "CSF",
"费率(%)": "100",
"children": [
{
"序号": "2.1",
"费用名称": "冬雨季施工增加费",
"代码": "DYF",
"取费基数": "RGF",
"费率(%)": "5.39"
},
{
"序号": "2.2",
"费用名称": "夜间施工增加费",
"代码": "YSF",
"取费基数": "RGF",
"费率(%)": "0.85"
},
{
"序号": "2.3",
"费用名称": "施工工具用具使用费",
"代码": "SYF",
"取费基数": "RGF",
"费率(%)": "5.33"
},
{
"序号": "2.4",
"费用名称": "特殊地区施工增加费",
"代码": "TSF",
"取费基数": "RGF",
"费率(%)": "0"
},
{
"序号": "2.5",
"费用名称": "临时设施费",
"代码": "LSF",
"取费基数": "DZF-甲供消材进项税额_单价",
"费率(%)": "4.97"
},
{
"序号": "2.6",
"费用名称": "施工机构迁移费",
"代码": "ZYF",
"取费基数": "RGF",
"费率(%)": "9.32"
},
{
"序号": "2.7",
"费用名称": "安全文明施工费",
"代码": "WMF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "2.93"
}
]
}
]
}
]
}
]
},
"安装": {
"name": "安装",
"TypeList": "安装,调试安装,措施二安装",
"tables": [
{
"name": "安装取费表",
"OutlayID": "2_3",
"类型": "安装",
"专业": "安装",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "RGF+CLF+JXF+GLF+LR+甲供不取费费用含税_单价+乙供不取费费用不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"取费基数": "RGF+CLF+JXF-取费人材机价差_单价",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价+取费人工价差_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBCL+TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "招标人采购材料",
"代码": "ZBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1.1",
"费用名称": "招标人采购消材",
"代码": "ZBXC",
"取费基数": "取费定额甲供材料费含税_单价+取费甲供材料价差含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.1.2",
"费用名称": "招标人采购主材",
"代码": "ZBZC",
"取费基数": "甲供取费主材费含税_单价+取费甲供主材价差含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.2.2",
"费用名称": "投标人采购材料",
"代码": "TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.2.1",
"费用名称": "投标人采购消材",
"代码": "TBXC",
"取费基数": "取费定额乙供材料费不含税_单价+取费乙供材料价差不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.2.2",
"费用名称": "投标人采购主材",
"代码": "TBZC",
"取费基数": "乙供取费主材费不含税_单价+取费乙供主材价差不含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.2.3",
"费用名称": "其中:暂估材料费",
"代码": "ZGC",
"取费基数": "主材暂估价_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价+取费机械价差_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "管理费",
"代码": "GLF",
"取费基数": "RGF-取费人工价差_单价",
"费率(%)": "107.44"
},
{
"序号": "3",
"费用名称": "利润",
"代码": "LR",
"取费基数": "ZJGCF+GLF+安装措施费_单价+安装规费_单价+安装施工企业配合调试费_单价-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "6"
}
]
},
{
"序号": "二",
"费用名称": "定额直接费",
"代码": "DEZJF",
"取费基数": "RGF+ZBXC+TBXC+JXF-(取费人工价差_单价+取费甲供材料价差含税_单价+取费乙供材料价差不含税_单价+取费机械价差_单价)",
"费率(%)": "100"
}
]
},
{
"name": "安装取费表(调试工程)",
"OutlayID": "2_4",
"类型": "调试安装",
"专业": "安装",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "RGF+CLF+JXF+GLF+LR+甲供不取费费用含税_单价+乙供不取费费用不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"取费基数": "RGF+CLF+JXF-取费人材机价差_单价",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价+取费人工价差_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBCL+TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "招标人采购材料",
"代码": "ZBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1.1",
"费用名称": "招标人采购消材",
"代码": "ZBXC",
"取费基数": "取费定额甲供材料费含税_单价+取费甲供材料价差含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.1.2",
"费用名称": "招标人采购主材",
"代码": "ZBZC",
"取费基数": "甲供取费主材费含税_单价+取费甲供主材价差含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.2.2",
"费用名称": "投标人采购材料",
"代码": "TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.2.1",
"费用名称": "投标人采购消材",
"代码": "TBXC",
"取费基数": "取费定额乙供材料费不含税_单价+取费乙供材料价差不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.2.2",
"费用名称": "投标人采购主材",
"代码": "TBZC",
"取费基数": "乙供取费主材费不含税_单价+取费乙供主材价差不含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.2.3",
"费用名称": "其中:暂估材料费",
"代码": "ZGC",
"取费基数": "主材暂估价_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价+取费机械价差_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "管理费",
"代码": "GLF",
"取费基数": "RGF-取费人工价差_单价",
"费率(%)": "107.44"
},
{
"序号": "3",
"费用名称": "利润",
"代码": "LR",
"取费基数": "ZJGCF+GLF+安装措施费_单价+安装规费_单价-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "6"
}
]
},
{
"序号": "二",
"费用名称": "定额直接费",
"代码": "DEZJF",
"取费基数": "RGF+ZBXC+TBXC+JXF-(取费人工价差_单价+取费甲供材料价差含税_单价+取费乙供材料价差不含税_单价+取费机械价差_单价)",
"费率(%)": "100"
}
]
},
{
"name": "安装取费表(措施二)",
"OutlayID": "2_5",
"类型": "措施二安装",
"专业": "安装",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "RGF+CLF+JXF+GLF+LR+甲供不取费费用含税_单价+乙供不取费费用不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"取费基数": "RGF+CLF+JXF-取费人材机价差_单价",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价+取费人工价差_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBCL+TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "招标人采购材料",
"代码": "ZBCL",
"取费基数": "取费定额甲供材料费含税_单价+甲供取费主材费含税_单价+取费甲供材料价差含税_单价+取费甲供主材价差含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.2",
"费用名称": "投标人采购材料",
"代码": "TBCL",
"取费基数": "取费定额乙供材料费不含税_单价+乙供取费主材费不含税_单价+取费乙供材料价差不含税_单价+取费乙供主材价差不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.3",
"费用名称": "其中:暂估材料费",
"代码": "ZGC",
"取费基数": "主材暂估价_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价+取费机械价差_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "管理费",
"代码": "GLF",
"取费基数": "RGF-取费人工价差_单价",
"费率(%)": "107.44"
},
{
"序号": "3",
"费用名称": "利润",
"代码": "LR",
"取费基数": "ZJGCF+GLF+安装规费_单价-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "6"
}
]
}
]
}
]
},
"计日工": {
"name": "计日工",
"TypeList": "计日工",
"tables": [
{
"name": "计日工取费表",
"OutlayID": "6_9",
"类型": "计日工",
"专业": "计日工",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "RGF+CLF+JXF+GLF+LR+计日工甲供不取费费用含税_单价+计日工乙供不取费费用不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"取费基数": "RGF+CLF+JXF-计日工人材机价差_单价",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "计日工人工费_单价+计日工人工价差_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBCL+TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "招标人采购材料",
"代码": "ZBCL",
"取费基数": "计日工甲供材料费含税_单价+计日工甲供取费主材费含税_单价+计日工甲供材料价差含税_单价+计日工取费甲供主材价差含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.2",
"费用名称": "投标人采购材料",
"代码": "TBCL",
"取费基数": "计日工乙供材料费不含税_单价+计日工乙供取费主材费不含税_单价+计日工乙供材料价差不含税_单价+计日工取费乙供主材价差不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.3",
"费用名称": "其中:暂估材料费",
"代码": "ZGC",
"取费基数": "计日工材料暂估价_单价+计日工主材暂估价_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "计日工机械费_单价+计日工机械价差_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "管理费",
"代码": "GLF",
"取费基数": "ZJGCF-计日工甲供消材进项税额_单价-计日工甲供主材进项税额_单价",
"费率(%)": "13.95"
},
{
"序号": "3",
"费用名称": "利润",
"代码": "LR",
"取费基数": "ZJGCF+GLF-计日工甲供消材进项税额_单价-计日工甲供主材进项税额_单价",
"费率(%)": "5"
}
]
}
]
}
]
},
"建筑": {
"name": "建筑",
"TypeList": "建筑,大型土石方建筑",
"tables": [
{
"name": "建筑取费表",
"OutlayID": "1_1",
"类型": "建筑",
"专业": "建筑",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "RGF+CLF+JXF+GLF+LR+甲供不取费费用含税_单价+乙供不取费费用不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"取费基数": "RGF+CLF+JXF-取费人材机价差_单价",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价+取费人工价差_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBCL+TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "招标人采购材料",
"代码": "ZBCL",
"取费基数": "取费定额甲供材料费含税_单价+甲供取费主材费含税_单价+取费甲供材料价差含税_单价+取费甲供主材价差含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.2",
"费用名称": "投标人采购材料",
"代码": "TBCL",
"取费基数": "取费定额乙供材料费不含税_单价+乙供取费主材费不含税_单价+取费乙供材料价差不含税_单价+取费乙供主材价差不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.3",
"费用名称": "其中:暂估材料费",
"代码": "ZGC",
"取费基数": "材料暂估价_单价+主材暂估价_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价+取费机械价差_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "管理费",
"代码": "GLF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "13.95"
},
{
"序号": "3",
"费用名称": "利润",
"代码": "LR",
"取费基数": "ZJGCF+GLF+建筑措施费_单价+建筑规费_单价-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "5"
}
]
}
]
},
{
"name": "大型土石方取费表",
"OutlayID": "1_2",
"类型": "大型土石方建筑",
"专业": "建筑",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "RGF+CLF+JXF+ZHQF+甲供不取费费用含税_单价+乙供不取费费用不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"取费基数": "RGF+CLF+JXF-取费人材机价差_单价",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价+取费人工价差_单价",
"费率(%)": "100"
},
{
"序号": "1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBCL+TBCL",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "招标人采购材料",
"代码": "ZBCL",
"取费基数": "取费定额甲供材料费含税_单价+甲供取费主材费含税_单价+取费甲供材料价差含税_单价+取费甲供主材价差含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.2",
"费用名称": "投标人采购材料",
"代码": "TBCL",
"取费基数": "取费定额乙供材料费不含税_单价+乙供取费主材费不含税_单价+取费乙供材料价差不含税_单价+取费乙供主材价差不含税_单价",
"费率(%)": "100"
},
{
"序号": "1.2.3",
"费用名称": "其中:暂估材料费",
"代码": "ZGC",
"取费基数": "材料暂估价_单价+主材暂估价_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价+取费机械价差_单价",
"费率(%)": "100"
}
]
},
{
"序号": "2",
"费用名称": "综合取费费用",
"代码": "ZHQF",
"取费基数": "ZJGCF-甲供消材进项税额_单价-甲供主材进项税额_单价",
"费率(%)": "16.59"
}
]
}
]
}
]
},
"拆除安装": {
"name": "拆除安装",
"TypeList": "拆除安装",
"tables": [
{
"name": "安装取费表(拆除)",
"OutlayID": "10_11",
"类型": "拆除安装",
"专业": "拆除安装",
"children": [
{
"序号": "一",
"费用名称": "综合单价",
"代码": "ZHDJ",
"取费基数": "ZJF+JJF+LR+RCJJC+不取费定额费不含税_单价",
"费率(%)": "100",
"children": [
{
"序号": "1",
"费用名称": "直接费",
"代码": "ZJF",
"费率(%)": "100",
"children": [
{
"序号": "1.1",
"费用名称": "直接工程费",
"代码": "ZJGCF",
"费率(%)": "100",
"children": [
{
"序号": "1.1.1",
"费用名称": "人工费",
"代码": "RGF",
"取费基数": "取费定额人工费_单价",
"费率(%)": "100"
},
{
"序号": "1.1.2",
"费用名称": "材料费",
"代码": "CLF",
"取费基数": "ZBXC+TBXC",
"费率(%)": "100",
"children": [
{
"序号": "1.1.2.1",
"费用名称": "招标人采购消材",
"代码": "ZBXC",
"取费基数": "取费定额甲供材料费含税_单价",
"费率(%)": "100"
},
{
"序号": "1.1.2.2",
"费用名称": "投标人采购消材",
"代码": "TBXC",
"取费基数": "取费定额乙供材料费不含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.1.3",
"费用名称": "机械费",
"代码": "JXF",
"取费基数": "取费定额机械费_单价",
"费率(%)": "100"
}
]
},
{
"序号": "1.2",
"费用名称": "措施费",
"代码": "CSF",
"费率(%)": "100",
"children": [
{
"序号": "1.2.1",
"费用名称": "冬雨季施工增加费",
"代码": "DYF",
"取费基数": "RGF+JXF",
"费率(%)": "1.71"
},
{
"序号": "1.2.2",
"费用名称": "施工工具用具使用费",
"代码": "SYF",
"取费基数": "RGF+JXF",
"费率(%)": "2.07"
},
{
"序号": "1.2.3",
"费用名称": "特殊地区施工增加费",
"代码": "TSF",
"取费基数": "RGF+JXF",
"费率(%)": "0"
},
{
"序号": "1.2.4",
"费用名称": "临时设施费",
"代码": "LSF",
"取费基数": "RGF+JXF",
"费率(%)": "7.03",
"备注": "独立的拆除工程可计取此项费,与其他工程同期实施的拆除工作不计取此项费用"
},
{
"序号": "1.2.5",
"费用名称": "施工机构迁移费",
"代码": "ZYF",
"取费基数": "RGF+JXF",
"费率(%)": "3.85",
"备注": "独立的拆除工程可计取此项费,与其他工程同期实施的拆除工作不计取此项费用"
},
{
"序号": "1.2.6",
"费用名称": "安全文明施工费",
"代码": "WMF",
"取费基数": "RGF+JXF",
"费率(%)": "9.15"
}
]
}
]
},
{
"序号": "2",
"费用名称": "间接费",
"代码": "JJF",
"费率(%)": "100",
"children": [
{
"序号": "2.1",
"费用名称": "规费",
"代码": "GF",
"费率(%)": "100",
"children": [
{
"序号": "2.1.1",
"费用名称": "社会保险费",
"代码": "SBF",
"取费基数": "RGF*1.15",
"费率(%)": "0"
},
{
"序号": "2.1.2",
"费用名称": "住房公积金",
"代码": "GJJ",
"取费基数": "RGF*1.15",
"费率(%)": "0"
}
]
},
{
"序号": "2.2",
"费用名称": "企业管理费",
"代码": "GLF",
"取费基数": "RGF+JXF",
"费率(%)": "27.85"
}
]
},
{
"序号": "3",
"费用名称": "利润",
"代码": "LR",
"取费基数": "RGF+JXF",
"费率(%)": "7.09"
},
{
"序号": "4",
"费用名称": "编制基准期价差",
"代码": "RCJJC",
"费率(%)": "100",
"children": [
{
"序号": "4.1",
"费用名称": "人工价差",
"代码": "RGC",
"取费基数": "取费人工价差_单价",
"费率(%)": "100"
},
{
"序号": "4.2",
"费用名称": "材料价差",
"代码": "CLC",
"取费基数": "ZBCLC+TBCLC",
"费率(%)": "100",
"children": [
{
"序号": "4.2.1",
"费用名称": "招标人采购材料价差",
"代码": "ZBCLC",
"取费基数": "取费甲供材料价差含税_单价",
"费率(%)": "100"
},
{
"序号": "4.2.2",
"费用名称": "投标人采购材料价差",
"代码": "TBCLC",
"取费基数": "取费乙供材料价差不含税_单价",
"费率(%)": "100"
}
]
},
{
"序号": "4.3",
"费用名称": "机械价差",
"代码": "JXC",
"取费基数": "取费机械价差_单价",
"费率(%)": "100"
}
]
}
]
}
]
}
]
}
},
"projectDivision": {
"建筑工程": {
"建筑": [
{
"GUID": "{76DF65DB-1127-4787-9322-EAAE07DA3C36}",
"项目名称": "变电站建筑工程",
"费率": "0",
"颜色标记": "标记:16777215;",
"type": "项目划分",
"专业类型": "变电建筑",
"notCheck": "1",
"children": [
{
"GUID": "{82546C1E-9C8E-4EF9-AA51-7FCE69BA9D17}",
"序号": "一",
"项目名称": "主要生产工程",
"费率": "0",
"取费表id": "1_1",
"颜色标记": "标记:16777215;",
"取费表": "建筑取费表",
"type": "项目划分",
"专业类型": "变电建筑",
"notCheck": "1",
"children": [
{
"GUID": "{7CAB5EE0-9285-42DF-9202-9FAB9C3C4644}",
"序号": "1",
"项目名称": "主要生产建筑",
"费率": "0",
"取费表id": "1_1",
"颜色标记": "标记:16777215;",
"取费表": "建筑取费表",
"type": "项目划分",
"专业类型": "变电建筑",
"notCheck": "1",
"children": [
{
"GUID": "{BE9834E7-0AAE-41B9-884D-776C93A3E0B6}",
"序号": "1.1",
"项目名称": "主控通信楼",
"费率": "0",
"编码": "BT1101",
"取费表id": "1_1",
"颜色标记": "标记:16777215;",
"取费表": "建筑取费表",
"type": "项目划分",
"专业类型": "变电建筑",
"资源库列表": [
{
"资源库名称": "变电建筑清单库(2014)"
},
{
"资源库名称": "预算 第四册 输电线路工程(2013年版)"
},
{
"资源库名称": "通用材料库"
},
{
"资源库名称": "常用设备价格信息2016"
}
],
"notCheck": "1",
"children": [
{
"GUID": "{6409EA1C-452D-4A5C-AEC9-B21B042DF941}",
"id": "{6409EA1C-452D-4A5C-AEC9-B21B042DF941}",
"清单名称": "余方弃置",
"项目名称": "余方弃置",
"清单全码": "BT1101A19001",
"编码": "A19",
"单位": "m?",
"计算式": "1",
"数量": "1",
"取费表": "1_1",
"计算规则": "按挖方清单项目工程量减利用回填方体积(正数)计算",
"工作内容": "1.余方点装料运输至弃置点",
"一笔性费用": "0",
"取费表名称": "建筑取费表",
"取费表类型": "建筑",
"资源库名称": "7",
"类型": "8",
"项目特征": [
{
"特征名称": "废弃料品种",
"特征序号": "1"
},
{
"特征名称": "运距",
"特征序号": "2"
}
],
"单价": "620.741133",
"合价": "620.741133",
"单价不含税": "620.741133",
"合价不含税": "620.741133",
"children": [
{
"颜色标记": "标记:16777215;",
"类型": "0",
"关联父级量": "0",
"id": "1938",
"项目名称": "电缆沟、槽、坑人工挖方及回填 普通土 坑深2.0m以内",
"编码": "YX7-1",
"单位": "m?",
"计算式": "2",
"数量": "2",
"中标计算式": "2",
"人工费": "10.16",
"机械费": "0.93",
"甲供材料费不含税": "0",
"其中:甲供材料费": "0",
"材料费": "0",
"定额系数": "1",
"人工系数": "1",
"材料系数": "1",
"机械系数": "1",
"定额范围": "1",
"资源库名称": "8",
"费用类型": "0",
"甲供材料费含税": "0",
"投标数量": "0",
"投标单价": "0",
"投标合价": "0",
"乙供材料费不含税": "0",
"乙供材料费含税": "0",
"notCheck": "1",
"单价不含税": "11.09",
"合价不含税": "22.18",
"特征段": "特征1",
"基价": "11.09",
"材机列表": [
{
"ID": "3",
"编码": "9101110",
"名称": "输电普通工",
"单位": "工日",
"类型": "2",
"预算价不含税": "34",
"市场价不含税": "34",
"预算价含税": "34",
"市场价含税": "34",
"结算预算价不含税": "0",
"结算市场价不含税": "0",
"结算预算价含税": "0",
"结算市场价含税": "0",
"暂估价": "0",
"拆分": "1",
"全口径市场价不含税": "0",
"全口径市场价含税": "0",
"是否未计价": "0",
"商品砼": "0",
"数量": "0.2753"
},
{
"ID": "4",
"编码": "9101111",
"名称": "输电技术工",
"单位": "工日",
"类型": "2",
"预算价不含税": "55",
"市场价不含税": "55",
"预算价含税": "55",
"市场价含税": "55",
"结算预算价不含税": "0",
"结算市场价不含税": "0",
"结算预算价含税": "0",
"结算市场价含税": "0",
"暂估价": "0",
"拆分": "1",
"全口径市场价不含税": "0",
"全口径市场价含税": "0",
"是否未计价": "0",
"商品砼": "0",
"数量": "0.0145"
},
{
"ID": "5",
"编码": "J13-01-079",
"名称": "输电专用载重汽车 4t",
"单位": "台班",
"类型": "4",
"预算价不含税": "259.005",
"市场价不含税": "259.005",
"预算价含税": "282.17",
"市场价含税": "282.17",
"结算预算价不含税": "0",
"结算市场价不含税": "0",
"结算预算价含税": "0",
"结算市场价含税": "0",
"暂估价": "0",
"拆分": "0",
"全口径市场价不含税": "0",
"全口径市场价含税": "0",
"是否未计价": "0",
"商品砼": "0",
"数量": "0.0036"
}
]
},
{
"颜色标记": "标记:16777215;",
"类型": "1",
"关联父级量": "0",
"id": "1940",
"预算价含税": "250.48",
"预算价不含税": "243.18",
"编码": "SP1007",
"项目名称": "商品混凝土",
"规格型号": "C40",
"单位": "m?",
"计算式": "2",
"数量": "2",
"损耗率": "1.5",
"供货方": "2",
"集中配送": "0",
"单重": "2589.5",
"资源库名称": "9",
"市场价不含税": "243.18",
"市场价含税": "250.48",
"单价不含税": "243.18",
"单价含税": "250.48",
"结算市场价不含税": "0",
"结算市场价含税": "0",
"基准价不含税": "0",
"基准价含税": "0",
"费用类型": "取费",
"投标数量": "0",
"投标单价": "0",
"增值税率": "0",
"notCheck": "1",
"特征段": "特征1",
"合价含税": "500.96",
"合价不含税": "486.36",
"线重": "0",
"制造长度": "0",
"截面积": "0"
},
{
"颜色标记": "标记:16777215;",
"类型": "5",
"关联父级量": "0",
"id": "1942",
"编码": "S0278",
"项目名称": "双进双出钢球磨",
"规格型号": "MGS47602100kW (含钢球、润滑油、密封风机等)",
"单位": "台",
"计算式": "2",
"供货方": "1",
"运杂费率": "0",
"数量": "2",
"单价不含税": "8119658",
"单价含税": "9500000",
"设备类型": "0",
"资源库名称": "10",
"投标数量": "0",
"投标单价": "0",
"增值税率": "0",
"notCheck": "1",
"特征段": "特征1",
"合价含税": "19000000",
"合价不含税": "16239316"
}
]
}
],
"最小资源库编码": "7"
}
]
}
]
}
]
}
]
}
}
},
"projectId": "0d49ac78e4ce52a2076f4ede2dcdee9c",
"stageStatus": "0"
}